Construction Project Management Guru (PSP, PMI-SP, PMP, Excel Charts, Excel Dashboard, Excel Analytics, Excel Shortcuts

Primavera P6 is a tool like no other when it comes whenever you think about planning and scheduling. Usually, it is hard to match what you have learned in a course with the. Most of the courses out there don't do this - they give you knowledge and you might not know how to use it. This course is different. It is with a real Construction Case Study from scratch.

Read more

Primavera P6 is a tool like no other when it comes whenever you think about planning and scheduling. Usually, it is hard to match what you have learned in a course with the. Most of the courses out there don't do this - they give you knowledge and you might not know how to use it. This course is different. It is with a real Construction Case Study from scratch.

No need to do this anymore. The course is created to teach you Primavera P6 with a real life construction case study. Not only that, you will learn the planning and scheduling skills and see how it is applied in Primavera P6. Planning and scheduling is not an easy task, it is one of the most important tasks in the project management. So Is Primavera P6 related with planning and scheduling? Is Primavera P6 related to Project Management? Is Primavera P6 has anything to do with the success of the project?

The answer to all of these questions is. , but how? - Primavera P6 is a tool and you can say it is a smart tool. It is a tool that helps you in the planning and scheduling process of the project. It is an amazing tool when it comes to monitoring and controlling. But, always remember that Primavera P6 is just a tool. To operate this tool you have to know minimum skills for planning and scheduling. So, what does Primavera P6 do? What will you get from such course?

Primavera P6 allows you to organize and manage the project ahead visually. You will breakdown the project into activities and create activity list in the Primavera P6. It allows you to manage the project scope, resources and it is beautiful in illustrating the time claims. Always remember that planning and scheduling is a knowledge area that can be easily represented using an amazing tool such as Primavera P6.

Construction projects are never easy. That's why this course has taken a construction case to carefully study it and make a schedule.

Planning is a vital project phase and it would take an enormous amount of time if it is done manually. Primavera P6 helps you in doing so. You have to understand the main concepts of planning first to plan any project successfully.

The course has taken a construction case example, but you might tailor it to your needs as well. You will get a taste of how planning and scheduling are done in construction projects with a step by step instructions for building a schedule.

A lot of projects if planned correctly will save a lot of time and cost to your organization. Always remember that Primavera P6 is only a tool to apply the planning and scheduling knowledge. This means you have to have a minimum knowledge on planning and scheduling; How to plan for projects.

By the end of the course you will learn that to plan any project successfully you should have a great tool. Primavera P6 is that tool. Primavera P6 helps you in the planning phase of any project. You will also get to know how a construction schedule is created with the minimum data. You will get insights in the construction schedule.

After successful completion of the course, you will be able to create a schedule cost and resource loaded from scratch, monitor the schedule, review a schedule, generate reports, understand planning and scheduling concepts and easily create your own construction schedule.

Planning is a vital project phase and it would take an enormous amount of time if it is done manually. Primavera P6 helps you in doing so. You have to understand the main concepts of planning first to plan any project successfully.

Main Topics: Planning and scheduling using Primavera P6, Construction Schedule, Construction Planning, Construction Scheduling, Construction Plan, Construction time frame, Construction Time Management, Construction Projects, Construction Management, Construction Monitoring, Construction Control, Oracle Primavera, Project Management using Primavera, Primavera P6 Schedule, Planning and Scheduling output, Primavera P6 course, Scheduling with Primavera course, Planning with Primavera course, Oracle Primavera course

Enroll now

Here's a deal for you

We found an offer that may be relevant to this course.
Save money when you learn. All coupon codes, vouchers, and discounts are applied automatically unless otherwise noted.

What's inside

Learning objectives

  • Build a schedule even with minimum data.
  • Create a construction schedule professionally from scratch.
  • Think as a planner and/or a scheduler.
  • Analyze the construction documents to produce a schedule that will get the team buy-in.
  • Apply the planning and scheduling knowledge into the primavera p6

Syllabus

Introduction
Main Content for Mastery of Primavera and to Apply.
What are the Toolbars? & Get familiar with them
Create Your Own Enterprise (EPS)
Read more
Optimize your project & Create your own Calendar
Plan how You are going to work first
Understand Your Project first! - Read the Drawings
Create Your Work Breakdown Structure (WBS)
Engineering Log & Add Your first Activity!
Building & Sequencing Your ACTIVITY LIST - Construction Section - Part 1(Struc.)
Building & Sequencing Your ACTIVITY LIST - Construction Section - Part 2(Struc.)
Building & Sequencing Your ACTIVITY LIST - Construction Section - Part 3 (MEP)
Building & Sequencing Your ACTIVITY LIST - Construction Section - Part 4 (MEP)
Building & Sequencing Your ACTIVITY LIST - Construction Section - Part 5 (Arch.)
Building & Sequencing Your ACTIVITY LIST - Construction Section - Part 6 (Arch.)
Building & Sequencing Your ACTIVITY LIST - Construction Section - Part 7(Overvi)
Building & Sequencing Your ACTIVITY LIST - Engineering Section
Sequencing Your ACTIVITY LIST - Engineering Part
Building & Sequencing Your ACTIVITY LIST - Procurement section
Creating Your first milestone - CONTRACTUAL Milestones!!
Non-Contractual Milestones
Milestones report- Higher Management Report!!
Structuring Your Activity Codes
OOPS! Something is MISSING
OOPS! Something is MISSING - Part 2
Utilize the Default FILTERS
LONGEST PATH and the CRITICAL FILTER - Wait What is the difference?!!
Utilize the Global Filters
Create Your OWN Customized FILTER
Customize Your Bar chart
Customize Your Bar-chart and Timeline
Group and Sort - What an amazing tool!!
Customize Your Activity Tabs
Constraints with a BONUS TIP!
Design Your Own Layouts
Resources - How to allocate and price it?
Resources - The Answer Revealed!!
Resources - The Trick to Allocate Thousand of Resources!!
Compress the Schedule to meet the CONTRACTUAL DATE
Optimize Your Resource According to Your Goals! - Learn How
Optimize Your Resource According to Your Goals! - Part 2
See how Primavera analyze - Schedule Log
What is Resource leveling and How to do it?!
Resources Leveling - TRICK Revealed
Review the Schedule
Update the Schedule
BONUS LECTURE - EXTENSION OF TIME CLAIM

Good to know

Know what's good
, what to watch for
, and possible dealbreakers
Builds upon existing scheduling and project management knowledge to cover Primavera P6, which is an industry-standard tool for planning and scheduling construction projects
Emphasizes hands-on practice through a real-life construction case study, making the learning more relevant and applicable
Taught by instructors with expertise in both Primavera P6 and project management, ensuring the quality and accuracy of the content
Covers a comprehensive range of topics related to planning and scheduling with Primavera P6, from creating schedules to monitoring and controlling projects
Emphasizes the practical application of planning and scheduling concepts, making the course highly relevant for professionals in the construction industry
Requires students to have some prior knowledge of planning and scheduling, making it more suitable for experienced professionals rather than complete beginners

Save this course

Save Primavera P6: Planning & Scheduling Construction Case Study to your list so you can find it easily later:
Save

Reviews summary

Primavera p6: planning and scheduling

Students say this Primavera P6 course is largely positive and engaging. Students appreciate the easy-to-follow, well-structured content. They report enjoying the knowledgeable and easy-to-understand teaching style. The course offers a great fit for beginners to learn the basics of Primavera P6 for use in planning and scheduling in construction.
Suitable for new learners
"Easy to understand for beginners."
"It is a great match for me. I have been using essential oils for years and always want to know how many other ways I can use them!"
"I am using it as a template for a copywriting course."
Organized and logical
"Easy to understand for beginners."
"Well-structured."
"It is a great match for me. I have been using essential oils for years and always want to know how many other ways I can use them!"
"I am using it as a template for a copywriting course."
Experienced and informative
"knowledgeable and easy to understand"
"Sal's background as a teacher really shows in the way she structures her courses and in the way she produces the content."
"She makes the material engaging and easy to understand."
"She really knows her stuff and is a great resource for mastering the tarot!"
Straightforward and simple
"so far love it!"
"easy to understand"
"good easy to understand"
"Very clearly explained"
"It’s very engaging so far"
Lack of updates
"Contents were good."
"However, there are some outdated codes which do not functional anymore."
"Needs to be updated."

Activities

Be better prepared before your course. Deepen your understanding during and after it. Supplement your coursework and achieve mastery of the topics covered in Primavera P6: Planning & Scheduling Construction Case Study with these activities:
Attend a Construction Industry Event
Attend a construction industry event to network with professionals, learn about industry trends, and gain insights into real-world construction projects.
Show steps
  • Research upcoming construction industry events
  • Attend the event
Review drawing interpretation
Reviewing how to interpret drawings will help you to understand the construction process and create a more accurate schedule.
Browse courses on Building Design
Show steps
  • Gather your drawing set.
  • Identify the different types of drawings.
  • Learn how to read the symbols and abbreviations.
  • Practice interpreting the drawings.
Create a Blueprint for a Construction Project
Start a project to design and plan a construction project from scratch. This will provide hands-on experience in applying the concepts and techniques learned in the course.
Show steps
  • Define the project scope and objectives
  • Research building codes and regulations
  • Develop a project schedule and budget
  • Create a site plan and layout
  • Design the building structure and systems
Seven other activities
Expand to see all activities and additional details
Show all ten activities
Follow a Tutorial on Primavera P6
Follow a tutorial to learn the basics of Primavera P6, the software used in the course for planning and scheduling construction projects.
Browse courses on Primavera P6
Show steps
  • Find a reputable tutorial on Primavera P6
  • Follow the tutorial step-by-step
Follow Primavera P6 Tutorials
Follow Primavera P6 tutorials to learn the basics of the software. This will help you get started with using Primavera P6 for project scheduling.
Show steps
  • Find Primavera P6 tutorials online or in books
  • Follow the tutorials step-by-step
  • Practice using Primavera P6 on your own projects
Practice Creating a Construction Schedule
Complete practice exercises to reinforce the concepts of construction scheduling. This will help develop proficiency in using Primavera P6.
Browse courses on Construction Scheduling
Show steps
  • Find practice exercises or create your own
  • Create a construction schedule using Primavera P6
  • Review and analyze the schedule
Practice Primavera P6 Scheduling
Practice Primavera P6 scheduling by working on sample projects. This will help you develop your skills and confidence in using the software.
Show steps
  • Find sample Primavera P6 projects online or in books
  • Open the sample projects in Primavera P6
  • Modify and update the schedules to meet your own requirements
Create a Primavera P6 Schedule from Scratch
Start a project to create a Primavera P6 schedule from scratch. This will allow you to apply the concepts and techniques you learn in the course and reinforce your understanding.
Show steps
  • Gather project requirements and data
  • Create a project plan and schedule in Primavera P6
  • Monitor and update the schedule as the project progresses
Contribute to an Open-Source Construction Software Project
Contribute to the development of an open-source construction software project to gain practical experience in construction project management and software development.
Browse courses on Open Source
Show steps
  • Find a suitable open-source construction software project
  • Review the project's documentation and code
  • Identify an area where you can contribute
Create a Primavera P6 Schedule for a Real-World Project
Create a Primavera P6 schedule for a real-world project. This will allow you to demonstrate your skills and knowledge of Primavera P6 and project scheduling.
Show steps
  • Identify a real-world project that you can schedule in Primavera P6
  • Gather project requirements and data
  • Create a project plan and schedule in Primavera P6
  • Monitor and update the schedule as the project progresses

Career center

Learners who complete Primavera P6: Planning & Scheduling Construction Case Study will develop knowledge and skills that may be useful to these careers:
Construction Planner
Construction Planners play a crucial role in the successful execution of construction projects by creating and managing project schedules. Primavera P6 is an industry-leading software tool specifically designed for planning and scheduling construction projects. This course provides comprehensive training on Primavera P6, equipping you with the skills and knowledge to excel as a Construction Planner. By learning how to build schedules, sequence activities, and analyze project constraints, you will be well-prepared to plan and manage construction projects effectively.
Project Scheduler
Project Schedulers are responsible for developing and maintaining project schedules for various types of projects, including construction projects. Primavera P6 is a widely used scheduling tool that offers advanced features for managing project timelines and dependencies. This course provides hands-on training in Primavera P6, enabling you to develop the skills necessary to succeed as a Project Scheduler. You will learn how to create schedules, allocate resources, and track project progress, ensuring that projects are completed on time and within budget.
Construction Manager
Construction Managers oversee all aspects of construction projects, including planning, scheduling, and execution. Primavera P6 is a valuable tool for Construction Managers as it allows them to visualize project timelines, identify potential bottlenecks, and make informed decisions. This course provides a comprehensive overview of Primavera P6, equipping you with the knowledge and skills to effectively manage construction projects. By understanding how to create and analyze schedules, you can ensure that projects are completed on time, within budget, and to the required standards.
Project Manager
Project Managers are responsible for planning, executing, and closing projects successfully. Primavera P6 is a powerful tool that can assist Project Managers in managing project schedules, resources, and costs. This course provides a comprehensive introduction to Primavera P6, enabling you to build a solid foundation in project management. By learning how to create and analyze schedules, allocate resources, and track project progress, you will be well-equipped to succeed as a Project Manager.
Construction Estimator
Construction Estimators are responsible for estimating the cost of construction projects. Primavera P6 can be used to create detailed schedules that can be used in the cost estimating process. This course provides an overview of Primavera P6, focusing on the features that are most relevant to Construction Estimators. By learning how to create and analyze schedules, you can improve the accuracy of your cost estimates and ensure that projects are profitable.
Civil Engineer
Civil Engineers design and oversee the construction of infrastructure projects, such as roads, bridges, and buildings. Primavera P6 can be used to plan and schedule construction projects, ensuring that they are completed on time and within budget. This course provides an introduction to Primavera P6, focusing on the features that are most relevant to Civil Engineers. By learning how to create and analyze schedules, you can effectively plan and manage civil engineering projects.
Architectural Designer
Architectural Designers create the plans and specifications for buildings. Primavera P6 can be used to plan and schedule the construction process, ensuring that projects are completed on time and within budget. This course provides an overview of Primavera P6, focusing on the features that are most relevant to Architectural Designers. By learning how to create and analyze schedules, you can effectively plan and manage architectural design projects.
Electrical Engineer
Electrical Engineers design and oversee the construction of electrical systems in buildings, such as lighting, power, and communications systems. Primavera P6 can be used to plan and schedule the installation of electrical systems, ensuring that projects are completed on time and within budget. This course provides an overview of Primavera P6, focusing on the features that are most relevant to Electrical Engineers. By learning how to create and analyze schedules, you can effectively plan and manage electrical engineering projects.
Mechanical Engineer
Mechanical Engineers design and oversee the construction of mechanical systems in buildings, such as heating, ventilation, and air conditioning (HVAC) systems. Primavera P6 can be used to plan and schedule the installation of mechanical systems, ensuring that projects are completed on time and within budget. This course provides an overview of Primavera P6, focusing on the features that are most relevant to Mechanical Engineers. By learning how to create and analyze schedules, you can effectively plan and manage mechanical engineering projects.
Safety Manager
Safety Managers are responsible for ensuring the safety of workers on construction projects. Primavera P6 can be used to track project progress and identify potential safety hazards. This course provides an overview of Primavera P6, focusing on the features that are most relevant to Safety Managers. By learning how to use Primavera P6, you can effectively monitor project progress and ensure that safety standards are met.
Quality Assurance Manager
Quality Assurance Managers are responsible for ensuring that construction projects meet quality standards. Primavera P6 can be used to track project progress and identify potential quality issues. This course provides an overview of Primavera P6, focusing on the features that are most relevant to Quality Assurance Managers. By learning how to use Primavera P6, you can effectively monitor project progress and ensure that quality standards are met.
Cost Engineer
Cost Engineers are responsible for estimating and controlling the cost of construction projects. Primavera P6 can be used to track project progress and identify potential cost overruns. This course provides an overview of Primavera P6, focusing on the features that are most relevant to Cost Engineers. By learning how to use Primavera P6, you can effectively monitor project progress and ensure that costs are controlled.
Planning Engineer
Planning Engineers are responsible for planning and scheduling construction projects. Primavera P6 is a widely used software tool specifically designed for planning and scheduling construction projects. This course provides comprehensive training on Primavera P6, equipping you with the skills and knowledge to excel as a Planning Engineer. By learning how to build schedules, sequence activities, and analyze project constraints, you will be well-prepared to plan and manage construction projects effectively.
Scheduling Engineer
Scheduling Engineers are responsible for developing and maintaining project schedules for various types of projects, including construction projects. Primavera P6 is a widely used scheduling tool that offers advanced features for managing project timelines and dependencies. This course provides hands-on training in Primavera P6, enabling you to develop the skills necessary to succeed as a Scheduling Engineer. You will learn how to create schedules, allocate resources, and track project progress, ensuring that projects are completed on time and within budget.
Construction Superintendent
Construction Superintendents oversee the day-to-day operations of construction projects. Primavera P6 can be used to track project progress and identify potential problems. This course provides an overview of Primavera P6, focusing on the features that are most relevant to Construction Superintendents. By learning how to use Primavera P6, you can effectively monitor project progress and ensure that projects are completed on time and within budget.

Reading list

We've selected seven books that we think will supplement your learning. Use these to develop background knowledge, enrich your coursework, and gain a deeper understanding of the topics covered in Primavera P6: Planning & Scheduling Construction Case Study.
Provides a comprehensive overview of the principles and practices of construction planning and scheduling. It is an excellent resource for those who want to learn the basics of construction planning and scheduling, and how to use Primavera P6 to implement these principles and practices.
Provides a comprehensive overview of the principles and practices of project management, with a focus on the construction industry. It is an excellent resource for those who want to learn the basics of project management, and how to use Primavera P6 to manage construction projects.
Provides a practical overview of the principles and practices of construction scheduling. It is an excellent resource for those who want to learn how to use Primavera P6 to schedule construction projects.
Is the official guide to the PMBOK, which is the standard for project management. It is an excellent resource for those who want to learn the basics of project management, and how to use Primavera P6 to implement the PMBOK.
Provides a comprehensive overview of the principles and practices of construction management. It is an excellent resource for those who want to learn the basics of construction management, and how to use Primavera P6 to manage construction projects.
Provides a comprehensive overview of the principles and practices of project management, with a focus on engineering projects. It is an excellent resource for those who want to learn the basics of project management, and how to use Primavera P6 to manage engineering projects.
Provides a comprehensive overview of the principles and practices of project management, with a focus on the design and construction industry. It is an excellent resource for those who want to learn the basics of project management, and how to use Primavera P6 to manage design and construction projects.

Share

Help others find this course page by sharing it with your friends and followers:

Similar courses

Here are nine courses similar to Primavera P6: Planning & Scheduling Construction Case Study.
Planning & Scheduling: Be the Professional from Scratch
Most relevant
Field Operations and Administrative Tools in Construction...
Most relevant
Project Management with Primavera P6
Most relevant
Construction Project Management
Most relevant
Construction Scheduling
Most relevant
Construction Management Field Operations and Admin Tools
Most relevant
Sustainable Construction Management
Most relevant
Contracts, Delays and Claims with Primavera P6
Sustainable Construction Management
Our mission

OpenCourser helps millions of learners each year. People visit us to learn workspace skills, ace their exams, and nurture their curiosity.

Our extensive catalog contains over 50,000 courses and twice as many books. Browse by search, by topic, or even by career interests. We'll match you to the right resources quickly.

Find this site helpful? Tell a friend about us.

Affiliate disclosure

We're supported by our community of learners. When you purchase or subscribe to courses and programs or purchase books, we may earn a commission from our partners.

Your purchases help us maintain our catalog and keep our servers humming without ads.

Thank you for supporting OpenCourser.

© 2016 - 2024 OpenCourser